Project Completion Certificate (Ground Water)
Scheme ID: 20060206 Name of Scheme: Aronda WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1846 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-Aug-2024 Actual Date of Completion (Capex): 04-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.05 M / 90.04 M Aroda 28.324979 77.713908
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 380 LPM / 44 M Aroda 28.324979 77.713908
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225 KL / 12 M Aroda 28.325085 77.713982
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 18.30
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.94
2 HDPE 75 0.041
3 HDPE 90 0.18
4 HDPE 110 0.094
5 HDPE 125 0.056
6 HDPE 140 0.15
HSC Connection
Sno. Total Nos.
1 393
Other Details
1.48
1.47
1.50
31-Mar-2026
01-Apr-2026