| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20060205 | Name of Scheme: Saraighasi WSS | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3860 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 02-Aug-2024 | Actual Date of Completion (Capex): 14-Sep-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 24.13 M / 85.83M | Saraighasi | 28.416607 | 77.761817 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 770 LPM / 44 M | Saraighasi | 28.416607 | 77.761817 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 225 KL / 12 M | Saraighasi | 28.416557 | 77.761715 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 9.24 | |
| 2 | HDPE | 75 | 0.28 | |
| 3 | HDPE | 90 | 0.13 | |
| 4 | HDPE | 110 | 0.30 | |
| 5 | HDPE | 140 | 0.049 | |
| 6 | HDPE | 160 | 0.13 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 864 |