Project Completion Certificate (Ground Water)
Scheme ID: 20060205 Name of Scheme: Saraighasi WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3860 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-Aug-2024 Actual Date of Completion (Capex): 14-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 24.13 M / 85.83M Saraighasi 28.416607 77.761817
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 770 LPM / 44 M Saraighasi 28.416607 77.761817
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225 KL / 12 M Saraighasi 28.416557 77.761715
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.24
2 HDPE 75 0.28
3 HDPE 90 0.13
4 HDPE 110 0.30
5 HDPE 140 0.049
6 HDPE 160 0.13
HSC Connection
Sno. Total Nos.
1 864
Other Details
2.40
2.39
2.42
31-Mar-2026
01-Apr-2026