Project Completion Certificate (Ground Water)
Scheme ID: 20059953 Name of Scheme: GOURA WSS No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 3150 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Jan-2024 Actual Date of Completion (Capex): 08-May-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering & Tubewwll assembly 27.15/112.72 GOURA 26.3628 82.53794
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 AC submercible pumping plant 12.5 HP 700/46 GOURA 26.36 82.537
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC STRUCTURE 200/16 GOURA 26.362 82.537
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.029
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.943
2 HDPE Pipe PN-6: Class PE-100 75 1.170
3 HDPE Pipe PN-6: Class PE-100 63 11.444
4 HDPE Pipe PN-6: Class PE-100 110 1.339
5 HDPE Pipe PN-6: Class PE-100 140 1.167
6 HDPE Pipe PN-6: Class PE-100 160 1.339
HSC Connection
Sno. Total Nos.
1 371
Other Details
2.59
2.59
2.59
08-May-2026
11-May-2026