Project Completion Certificate (Ground Water)
Scheme ID: 20059141 Name of Scheme: TANDAUNA JJM No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 3520 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Jul-2024 Actual Date of Completion (Capex): 16-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24M / 123M TANDAUNA 27.586703 80.249218
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 44.4 M³ / 41M TANDAUNA 27.586703 80.249218
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225 KL / 12M TANDAUNA 27.586703 80.249218
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.026
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 2.856
2 HDPE PIPE PN:-6 75 2.011
3 HDPE PIPE PN:-6 90 1.196
4 HDPE PIPE PN:-6 110 .245
5 HDPE PIPE PN:-6 125 .127
6 HDPE PIPE PN:-6 140 1.656
7 HDPE PIPE PN:-6 160 0
8 HDPE PIPE PN:-6 180 0
9 HDPE PIPE PN:-6 200 .28
HSC Connection
Sno. Total Nos.
1 692
Other Details
2.30
0.00
2.50
17-Jul-2025
26-Sep-2025