| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20059070 | Name of Scheme: RAMPUR HIRA WSS | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2040 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 30-Sep-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 18.00/90.44 | RAMPUR HIRA | 28.189247 | 80.089929 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VP PUMP -1 | 24.60 M3 / 45 M | RAMPUR HIRA | 28.189247 | 80.089929 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT -1 | 125 KL-14 M | RAMPUR HIRA | 28.189241 | 80.089806 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 | 100 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6Kg | 63 | 4.806 | |
| 2 | HDPE / 6Kg | 75 | 0.877 | |
| 3 | HDPE / 6Kg | 90 | 0.051 | |
| 4 | HDPE / 6Kg | 110 | 0.817 | |
| 5 | HDPE / 6Kg | 140 | 0.472 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 394 |