Project Completion Certificate (Ground Water)
Scheme ID: 20058935 Name of Scheme: AMANGAR WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2057 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 20-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 30.10/164.51 Amannagar 29.526173 78.335793
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 430/60 Amannagar 29.526173 78.335793
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125 kl / 16 Amannagar 29.526173 78.335793
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 100 0.032
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.205
2 HDPE 75 0.977
3 HDPE 90 0.898
4 HDPE 110 0.1347
5 HDPE 125 0.122
6 HDPE 140 0.1038
7 HDPE 160 0.085
8 HDPE 180 0.006
HSC Connection
Sno. Total Nos.
1 455
Other Details
1.93
0.00
1.95
20-Jun-2025
21-Jun-2025