Project Completion Certificate (Ground Water)
Scheme ID: 20058569 Name of Scheme: RAMPUR KORA JJM No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 3530 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Aug-2024 Actual Date of Completion (Capex): 27-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24M / 112M RAMPUR KORA 27.597847 80.103095
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 45 M³ / 45M RAMPUR KORA 27.597847 80.103095
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225KL / 14M RAMPUR KORA 27.597847 80.103095
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.038
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 3.864
2 HDPE PIPE PN:-6 75 1.746
3 HDPE PIPE PN:-6 90 1.36
4 HDPE PIPE PN:-6 110 0.129
5 HDPE PIPE PN:-6 125 0.036
6 HDPE PIPE PN:-6 140 2.143
7 HDPE PIPE PN:-6 160 0.00
8 HDPE PIPE PN:-6 180 0.00
9 HDPE PIPE PN:-6 200 0.156
HSC Connection
Sno. Total Nos.
1 960
Other Details
2.69
0.00
2.62
26-Jul-2025
26-Sep-2025