Project Completion Certificate (Ground Water)
Scheme ID: 20058543 Name of Scheme: UKHRI WSS No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3327 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 20-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 27.03/ 93.89 UKHRI 28.063038 79.733989
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 38.28 M3 / 45 M UKHRI 28.063038 79.733989
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 175 KL-14 M UKHRI 28.063002 79.733833
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 125 0.0285
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 5.124
2 HDPE / 6KG 75 0.242
3 HDPE / 6KG 90 0.086
4 HDPE / 6KG 110 1.135
5 HDPE / 6KG 140 0.457
6 HDPE / 6KG 160 0.175
HSC Connection
Sno. Total Nos.
1 547
Other Details
2.06
0.00
2.06
21-May-2024
06-Dec-2024