Project Completion Certificate (Ground Water)
Scheme ID: 20058516 Name of Scheme: MANIKPUR Water Supply Scheme No. of Villages: 5 No. of Habitation Covered: 17
Total Population Covered: 3000 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Dec-2023 Actual Date of Completion (Capex): 06-May-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering & Tubewwll assembly 20/98.33 MANIKPUR 26.353199 82.502854
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 AC submercible pumping plant 12.5 HP 650/44 MANIKPUR 26.353 82.502
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC STRUCTURE 175/14 MANIKPUR 26.35 82.50
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 125 0.039
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.940
2 HDPE Pipe PN-6: Class PE-100 75 0.712
3 HDPE Pipe PN-6: Class PE-100 63 14.810
4 HDPE Pipe PN-6: Class PE-100 110 0.453
5 HDPE Pipe PN-6: Class PE-100 140 2.444
6 HDPE Pipe PN-6: Class PE-100 160 0.375
HSC Connection
Sno. Total Nos.
1 452
Other Details
2.87
2.87
2.68
06-May-2026
07-May-2026