| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20058183 | Name of Scheme: NAYA GAON JJM | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 4180 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 22-Sep-2024 | Actual Date of Completion (Capex): 23-Mar-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 30 m / 98m | Naya Gaon Habibpur | 27.446579 | 80.146117 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 880 LMP / 45 M | Naya Gaon Habibpur | 27.446579 | 80.146117 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe | 150 | 34 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.261 | |
| 2 | HDPE | 75 | 3.556 | |
| 3 | HDPE | 90 | 2.553 | |
| 4 | HDPE | 110 | 1.837 | |
| 5 | HDPE | 125 | 1.951 | |
| 6 | HDPE | 160 | .898 | |
| 7 | HDPE | 200 | .537 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 785 |