Project Completion Certificate (Ground Water)
Scheme ID: 20057864 Name of Scheme: BHARIGWYAN JJM No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 5360 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Aug-2024 Actual Date of Completion (Capex): 07-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 33M / 95M BHARIGWYAN 27.433334 79.79798831
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 67.2M³ / 45M BHARIGWYAN 27.433334 79.79798831
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 325KL /16M BHARIGWYAN 27.433334 79.79798831
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 200 0.052
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 3.237
2 HDPE PIPE PN:-6 75 3.597
3 HDPE PIPE PN:-6 90 1.188
4 HDPE PIPE PN:-6 110 2.080
5 HDPE PIPE PN:-6 125 .457
6 HDPE PIPE PN:-6 140 2.713
7 HDPE PIPE PN:-6 160 1.090
8 HDPE PIPE PN:-6 180 0.439
9 HDPE PIPE PN:-6 200 1.143
HSC Connection
Sno. Total Nos.
1 1025
Other Details
3.95
0.00
3.91
06-Aug-2025
30-Sep-2025