Scheme ID: 20057212 Name of Scheme: ASYOLI (GOGP) JJM. No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 4180 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Feb-2024 Actual Date of Completion (Capex): 23-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30 M/ 112.8 M ASYOLI (GOGP) 27.358302 80.11445
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.830 M³ per Min /47 Mtr ASYOLI (GOGP) 27.358302 80.11445
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 250 KL/ 18 Mtr ASYOLI (GOGP) 27.358344 80.114498
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.020
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 3.647
2 HDPE Pipe PN-6: Class PE-100 75 2.106
3 HDPE Pipe PN-6: Class PE-100 90 1.751
4 HDPE Pipe PN-6: Class PE-100 110 0.494
5 HDPE Pipe PN-6: Class PE-100 125 1.380
6 HDPE Pipe PN-6: Class PE-100 140 0.334
7 HDPE Pipe PN-6: Class PE-100 200 3.169
HSC Connection
Sno. Total Nos.
1 684
Other Details
3.37
0.00
3.30
22-May-2024
20-Sep-2025