Scheme ID: 20057190 Name of Scheme: ANJHI JJM No. of Villages: 3 No. of Habitation Covered: 4
Total Population Covered: 4380 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Jul-2024 Actual Date of Completion (Capex): 17-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 27M / 104M ANJHI 27.641129 80.022819
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 57M³ / 45M ANJHI 27.641129 80.022819
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275KL / 14M ANJHI 27.641129 80.022819
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 200 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 4.612
2 HDPE PIPE PN:-6 75 3.208
3 HDPE PIPE PN:-6 90 4.634
4 HDPE PIPE PN:-6 110 3.006
5 HDPE PIPE PN:-6 125 0.00
6 HDPE PIPE PN:-6 140 0.180
7 HDPE PIPE PN:-6 160 0.276
8 HDPE PIPE PN:-6 180 0.017
9 HDPE PIPE PN:-6 200 0.00
HSC Connection
Sno. Total Nos.
1 1070
Other Details
3.28
0.00
3.26
16-Jul-2025
30-Sep-2025