Project Completion Certificate (Ground Water)
Scheme ID: 20056897 Name of Scheme: BHAINSARI JJM No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 4550 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 10-Sep-2024 Actual Date of Completion (Capex): 30-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30M/119M BHAINSARI 27.432103 80.305623
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 53.4M³/41M BHAINSARI 27.432103 80.305623
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275KL/12M BHAINSARI 27.432103 80.305623
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIIPE 200 0.036
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 3.992
2 HDPE PIPE PN:-6 75 3.740
3 HDPE PIPE PN:-6 90 3.287
4 HDPE PIPE PN:-6 110 0.439
5 HDPE PIPE PN:-6 125 0.778
6 HDPE PIPE PN:-6 140 0.302
7 HDPE PIPE PN:-6 160 0.240
8 HDPE PIPE PN:-6 180 0.00
9 HDPE PIPE PN:-6 200 0.202
HSC Connection
Sno. Total Nos.
1 929
Other Details
2.84
0.00
2.93
29-Jun-2025
21-Sep-2025