| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20056129 | Name of Scheme: Bhararipur PWS | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2050 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-Sep-2023 | Actual Date of Completion (Capex): 12-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 21.09 Mtr./ 118.98 Mtr. | Bhararipur | 26.44530263 | 79.55271517 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | (35.9 M3/Hr.) / 49 Mtr. | Bhararipur | 26.44530263 | 79.55271517 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 125 Kl/ 12 Mtr. | Bhararipur | 26.44530619 | 79.55256328 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 100 | 0.0142 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.304 | |
| 2 | HDPE | 75 | 0.328 | |
| 3 | HDPE | 90 | 0.805 | |
| 4 | HDPE | 110 | 0.192 | |
| 5 | HDPE | 140 | 0.179 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 432 |