Project Completion Certificate (Ground Water)
Scheme ID: 20055736 Name of Scheme: TENDUAKAJI WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2560 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 27-Dec-2022 Actual Date of Completion (Capex): 13-Jul-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 19.00/79.30 TENDUAKAJI 26.243376 82.478775
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPUMP-1 530LPM/41M TENDUAKAJI 26.243376 82.478775
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150KL/12M TENDUAKAJI 26.243376 82.478775
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-PIPE K7 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6; CLASS PE - 100 63 9.965
2 HDPE PIPE PN-6; CLASS PE - 100 75 2.657
3 HDPE PIPE PN-6; CLASS PE - 100 90 0.655
4 HDPE PIPE PN-6; CLASS PE - 100 110 2.178
5 HDPE PIPE PN-6; CLASS PE - 100 140 0.166
6 HDPE PIPE PN-6; CLASS PE - 100 160 0.571
HSC Connection
Sno. Total Nos.
1 350
Other Details
205.46
0.00
206.02
09-Jan-2026
01-Feb-2026