Project Completion Certificate (Ground Water)
Scheme ID: 20055677 Name of Scheme: Masodpur PWS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2165 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2023 Actual Date of Completion (Capex): 12-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 18.00 Mtr./114.50 Mtr. Masodpur 26.778703 79.404799
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible (34.5M3/Hr.)/46Mtr. Masodpur 26.778703 79.404799
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/16 Masodpur 26.78218 79.40893
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 .017
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.06
2 HDPE 75 0.37
3 HDPE 90 0.59
4 HDPE 110 0.15
5 HDPE 140 0.08
6 HDPE 160 0.60
HSC Connection
Sno. Total Nos.
1 469
Other Details
1.72
1.76
1.76
25-Oct-2024
25-Jan-2025