Project Completion Certificate (Ground Water)
Scheme ID: 20051718 Name of Scheme: CHHARAULI WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2130 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Nov-2023 Actual Date of Completion (Capex): 06-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21/55.30 CHHARAULI 26.252282 82.018212
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP-1 450LPM/43M CHHARAULI 26.252282 82.018212
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125KL/12M CHHARAULI 26.252282 82.018212
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE K-7 100 0.034
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 CLASS PE -100 63 10.991
2 HDPE PIPE PN-6 CLASS PE -100 75 0.579
3 HDPE PIPE PN-6 CLASS PE -100 90 0.103
4 HDPE PIPE PN-6 CLASS PE -100 110 0.379
5 HDPE PIPE PN-6 CLASS PE -100 140 0.198
HSC Connection
Sno. Total Nos.
1 410
Other Details
1.93
0.00
1.99
05-Apr-2025
01-Sep-2025