Project Completion Certificate (Ground Water)
Scheme ID: 20051650 Name of Scheme: ERUL WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2410 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Dec-2023 Actual Date of Completion (Capex): 03-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TubeWell 24/125.80 Erul 26.415378 82.152943
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT pump-1 510 LPM/43 m Erul 26.415378 82.152943
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150KL/12m Erul 26.415378 82.152943
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI pipe K-7 100 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 12.382
2 HDPE Pipe PN-6: Class PE-100 75 1.200
3 HDPE Pipe PN-6: Class PE-100 90 0.797
4 HDPE Pipe PN-6: Class PE-100 110 0.206
5 HDPE Pipe PN-6: Class PE-100 140 0.436
6 HDPE Pipe PN-6: Class PE-100 160 0.071
HSC Connection
Sno. Total Nos.
1 405
Other Details
2.14
0.00
2.07
02-May-2025
01-Sep-2025