Project Completion Certificate (Ground Water)
Scheme ID: 20050998 Name of Scheme: JUDARA WATER SUPPLY SCHEME No. of Villages: 5 No. of Habitation Covered: 5
Total Population Covered: 2840 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 02-Dec-2023 Actual Date of Completion (Capex): 04-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 20/258.3 JUDARA 26.199281 82.087291
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP 600 LPM/44 M JUDARA 26.199281 82.087291
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175KL/12M JUDARA 26.199281 82.087291
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE K7 100 0.009
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 CLASS PE-100 63 15.981
2 HDPE PIPE PN-6 CLASS PE-100 75 1.778
3 HDPE PIPE PN-6 CLASS PE-100 90 1.745
4 HDPE PIPE PN-6 CLASS PE-100 110 1.515
5 HDPE PIPE PN-6 CLASS PE-100 140 0.33
6 HDPE PIPE PN-6 CLASS PE-100 160 0.026
HSC Connection
Sno. Total Nos.
1 510
Other Details
2.38
0.00
2.41
04-Jun-2025
01-Sep-2025