| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20050775 | Name of Scheme: BANUADEEH VILLAGE WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 9 |
| Total Population Covered: 3125 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 30-Dec-2026 | Actual Date of Completion (Capex): 30-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 300 | 12m/53.05m | Banuadeeh | 26.02185 | 82.616975 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.5 HP | 660 LPM/47 M | Banuadeeh | 26.02185 | 82.616975 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200 KL/16 Mtr | Banuadeeh | 26.021674 | 82.616717 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 150 | 0.0255 | Yes |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 1.73 | yes |
| 2 | HDPE | 75 | 2.54 | yes |
| 3 | HDPE | 63 | 2.88 | yes |
| 4 | HDPE | 110 | 1.04 | yes |
| 5 | HDPE | 140 | 0.504 | yes |
| 6 | HDPE | 160 | 0.821 | yes |
| 7 | HDPE | 180 | 1.269 | yes |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 342 |