| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20050177 | Name of Scheme: NAUGAI GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 3516 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 15-Jun-2024 | Actual Date of Completion (Capex): 07-Apr-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 133.30/27.02 | NAUGAI | 27.168958 | 79.491233 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSSIBLE PUMP | 750/63 | NAUGAI | 27.168958 | 79.491233 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200 | NAUGAI | 27.168958 | 79.491233 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.0015 | Clear Water Rising Main |
| 2 | DI | 150 | 0.02840 | Clear Water Rising Main |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 2.59 | Distribution Network |
| 2 | HDPE | 63 | 7.00 | Distribution Network |
| 3 | HDPE | 110 | 0.168 | Distribution Network |
| 4 | HDPE | 140 | 0.236 | Distribution Network |
| 5 | HDPE | 160 | 0.110 | Distribution Network |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 820 |