Project Completion Certificate (Ground Water)
Scheme ID: 20050177 Name of Scheme: NAUGAI GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3516 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 15-Jun-2024 Actual Date of Completion (Capex): 07-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 133.30/27.02 NAUGAI 27.168958 79.491233
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSSIBLE PUMP 750/63 NAUGAI 27.168958 79.491233
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 NAUGAI 27.168958 79.491233
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0015 Clear Water Rising Main
2 DI 150 0.02840 Clear Water Rising Main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 2.59 Distribution Network
2 HDPE 63 7.00 Distribution Network
3 HDPE 110 0.168 Distribution Network
4 HDPE 140 0.236 Distribution Network
5 HDPE 160 0.110 Distribution Network
HSC Connection
Sno. Total Nos.
1 820
Other Details
3.23
3.19
3.23
11-Jul-2024
12-Jul-2024