Project Completion Certificate (Ground Water)
Scheme ID: 20047631 Name of Scheme: BASANTPUR CHHOTU Water Supply Scheme No. of Villages: 6 No. of Habitation Covered: 6
Total Population Covered: 2968 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 25-Nov-2023 Actual Date of Completion (Capex): 15-Aug-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of borewell Assembly 57.63M / 24.03M Basantpur Chottu 26.416059 83.038099
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 HP Submersible Pump 650LPM/46M Basantpur Chottu 26.416059 83.038099
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 1.077
2 HDPE Pipe PN-6: Class PE-100 75 1.185
3 HDPE Pipe PN-6: Class PE-100 63 13.414
4 HDPE Pipe PN-6: Class PE-100 110 1.846
5 HDPE Pipe PN-6: Class PE-100 140 1.830
6 HDPE Pipe PN-6: Class PE-100 160 0.103
HSC Connection
Sno. Total Nos.
1 370
Other Details
2.48
2.47
2.47
01-Jan-2026
02-Jan-2026