Project Completion Certificate (Ground Water)
Scheme ID: 20041614 Name of Scheme: FAZILPUR USKA WSS No. of Villages: 4 No. of Habitation Covered: 7
Total Population Covered: 5770 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Nov-2023 Actual Date of Completion (Capex): 25-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 30/72.8 AUJHIPUR 26°32'24.2016"N 82°47'43.46484"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump 60/44 AUJHIPUR 26°32'24.2016"N 82°47'43.46484"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.04 Yes
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 19.956
2 HDPE Pipe PN-6: Class PE-100 75 0.693
3 HDPE Pipe PN-6: Class PE-100 90 1.636
4 HDPE Pipe PN-6: Class PE-100 110 0.2093
5 HDPE Pipe PN-6: Class PE-100 125 0.852
6 HDPE Pipe PN-6: Class PE-100 140 0.571
7 HDPE Pipe PN-6: Class PE-100 180 0.084
HSC Connection
Sno. Total Nos.
1 600
Other Details
3.30
0.00
0.00
04-Sep-2026
05-Sep-2026