| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20041587 | Name of Scheme: GAUSPUR VILLAGE WATER SUPPLY SCHEMEGRAM PANCHAYAT | No. of Villages: 3 | No. of Habitation Covered: 4 |
| Total Population Covered: 3165 | Base Year: 2038 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 18-Nov-2022 | Actual Date of Completion (Capex): 31-Dec-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 300 | 10m/60.27 | Gauspur | 25.961252 | 82.590167 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.5HP | 632LPM/44M | Gauspur | 25.961252 | 82.590167 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200KL/12M | Gauspur | 25.961447 | 82.590088 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 100 | 0.031 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPF | 90 | 1.972 | |
| 2 | HDPF | 75 | 1.115 | |
| 3 | HDPF | 63 | 2.790 | |
| 4 | HDPF | 110 | 0.661 | |
| 5 | HDPF | 140 | 0.559 | |
| 6 | HDPF | 160 | 0.345 | |
| 7 | HDPF | 180 | 0.287 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 374 |