Scheme ID: 20041574 Name of Scheme: KALAYANPUR UDYANPUR No. of Villages: 2 No. of Habitation Covered: 11
Total Population Covered: 2960 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Nov-2024 Actual Date of Completion (Capex): 30-Aug-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 24/79.80 Ahirauti Sagarpatti 26º 32' 39.61" N 82º 45' 29.27" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump-1 39/46 Ahirauti Sagarpatti 26º 32' 39.61" N 82º 45' 29.27" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum Tank 175/14 Ahirauti Sagarpatti 26º 32' 39.61" N 82º 45' 29.27" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 13.796
2 HDPE Pipe PN-6: Class PE-100 75 1.667
3 HDPE Pipe PN-6: Class PE-100 90 0.172
4 HDPE Pipe PN-6: Class PE-100 110 0.701
5 HDPE Pipe PN-6: Class PE-100 140 1.758
6 HDPE Pipe PN-6: Class PE-100 160 0.742
7 HDPE Pipe PN-6: Class PE-100 180 0.020
HSC Connection
Sno. Total Nos.
1 387
Other Details
2.50
0.00
0.00
17-Dec-2025
01-Jan-2026