Project Completion Certificate (Ground Water)
Scheme ID: 20039793 Name of Scheme: Dhagaon PWS No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 4863 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 19-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 28.05 m/166.29 m Dahgaon 26.542255 79.5967
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1000 lpm/ 51 m Dahgaon 26.542255 79.5967
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 275 kl / 14 m Dahgaon 26.542255 79.5967
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.888
2 HDPE 90 2.397
3 HDPE 110 2.783
4 HDPE 125 1.319
5 HDPE 140 0.891
6 HDPE 160 1.147
7 HDPE 180 1.057
HSC Connection
Sno. Total Nos.
1 877
Other Details
3.54
0.00
0.00
18-Jun-2025
20-Jun-2025