Project Completion Certificate (Ground Water)
Scheme ID: 20036716 Name of Scheme: DARAUNA GRAMIN PEYJAL YOJNA No. of Villages: 2 No. of Habitation Covered: 11
Total Population Covered: 5988 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 13-May-2024 Actual Date of Completion (Capex): 06-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 138.00/24.05 DARAUNA 26.938019 79.340107
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSSIBLE PUMP 1250/63 DARAUNA 26.938019 79.340107
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 350/16 DARAUNA 26.938019 79.340107
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0015 Clear Water Rising Main
2 DI 150 0.022 Clear Water Rising Main
3 DI 200 0.0055 Clear Water Rising Main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 7.032 Distribution Network
2 HDPE 63 14.81 Distribution Network
3 HDPE 110 2.254 Distribution Network
4 HDPE 140 2.97 Distribution Network
5 HDPE 160 0.451 Distribution Network
6 HDPE 180 1.559 Distribution Network
7 HDPE 200 0.666 Distribution Network
HSC Connection
Sno. Total Nos.
1 1001
Other Details
5.72
5.59
5.72
08-Jul-2024
09-Jul-2024