| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20036716 | Name of Scheme: DARAUNA GRAMIN PEYJAL YOJNA | No. of Villages: 2 | No. of Habitation Covered: 11 |
| Total Population Covered: 5988 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 13-May-2024 | Actual Date of Completion (Capex): 06-Apr-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 138.00/24.05 | DARAUNA | 26.938019 | 79.340107 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSSIBLE PUMP | 1250/63 | DARAUNA | 26.938019 | 79.340107 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 350/16 | DARAUNA | 26.938019 | 79.340107 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.0015 | Clear Water Rising Main |
| 2 | DI | 150 | 0.022 | Clear Water Rising Main |
| 3 | DI | 200 | 0.0055 | Clear Water Rising Main |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 7.032 | Distribution Network |
| 2 | HDPE | 63 | 14.81 | Distribution Network |
| 3 | HDPE | 110 | 2.254 | Distribution Network |
| 4 | HDPE | 140 | 2.97 | Distribution Network |
| 5 | HDPE | 160 | 0.451 | Distribution Network |
| 6 | HDPE | 180 | 1.559 | Distribution Network |
| 7 | HDPE | 200 | 0.666 | Distribution Network |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1001 |