| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20036527 | Name of Scheme: SEKHUI GP WSS | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 1541 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2026 | Actual Date of Completion (Capex): 15-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 124.24 | SEKHUI | 27.2882 | 83.1280 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 350LPM/41M | SEKHUI | 27.2255 | 83.1525 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 100 KL/12 M | SEKHUI | 27.2352 | 83.1533 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI/K9 | 80 | 25 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PE 100 PN 6/HDPE | 63 | 5026.3 | |
| 2 | PE 100 PN 6/HDPE | 75 | 125 | |
| 3 | PE 100 PN 6/HDPE | 90 | 1178 | |
| 4 | PE 100 PN 6/HDPE | 110 | 259 | |
| 5 | PE 100 PN 6/HDPE | 125 | 238 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 209 |