Project Completion Certificate (Ground Water)
Scheme ID: 20035969 Name of Scheme: KATKHOR WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2140 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-Apr-2024 Actual Date of Completion (Capex): 15-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 MSERW PAIN PIPE-200 MM 36M KATKHOR 27.382581 83.681848
2 MSERW SLOTTED PIPE- 150 MM 15M KATKHOR 27.382581 83.681848
3 MSERW PLAIN PIPE- 150 MM 69M KATKHOR 27.382581 83.681848
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 29.99/39M KATKHOR 27.382581 83.681848
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ZINK ALM OHT 150KL/14M KATKHOR 27.382327 83.681883
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DOUBLE FLANGE DI-K9 150 .0488
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6/PE-100/HDPE 63 2.90
2 PN-6/PE-100/HDPE 75 2.74
3 PN-6/PE-100/HDPE 90 1.25
4 PN-6/PE-100/HDPE 110 0.39
5 PN-6/PE-100/HDPE 125 0.21
HSC Connection
Sno. Total Nos.
1 231
Other Details
1.70
0.00
1.78
16-Mar-0025