| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20035164 | Name of Scheme: LAKHA BAUNDI GRAM PANCHAYAT WATER SCHEME | No. of Villages: 1 | No. of Habitation Covered: 8 |
| Total Population Covered: 3447 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2025 | Actual Date of Completion (Capex): 27-Nov-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24.01/294.5 | LAKHA BAUNDI | 27.559717 | 81.482586 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump | 30/37 | LAKHA BAUNDI | 27.559717 | 81.482586 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/14 | LAKHA BAUNDI | 27.559767 | 81.482845 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | RISING MAIN/DI-K7 | 150 | 0.034 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6; Class PE-100 | 63 | 4.548 | |
| 2 | HDPE Pipe PN-6; Class PE-100 | 75 | 1.136 | |
| 3 | HDPE Pipe PN-6; Class PE-100 | 90 | 0.797 | |
| 4 | HDPE Pipe PN-6; Class PE-100 | 110 | 0.146 | |
| 5 | HDPE Pipe PN-6; Class PE-100 | 125 | 0.171 | |
| 6 | HDPE Pipe PN-6; Class PE-100 | 140 | 0.940 | |
| 7 | HDPE Pipe PN-6; Class PE-100 | 160 | 0.365 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 297 |