| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20034856 | Name of Scheme: DHIKIYA PUR | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 3420 | Base Year: 2023 | Intermediate Year: 0 | Design Year: 0 |
| Date of Completion (As per Contract): 01-Jun-2022 | Actual Date of Completion (Capex): 15-Aug-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBE WELL | 26.40 M / 144.27 M | DHIKIYAPUR | 26.596816 | 79.630598 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 750 LPM / 51 M | DHIKIYAPUR | 26.596816 | 79.630598 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200 KL / 14 M | DHIKIYAPUR | 26.596816 | 79.630598 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.0135 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.011 | |
| 2 | HDPE | 90 | 1.806 | |
| 3 | HDPE | 110 | 1.317 | |
| 4 | HDPE | 125 | 0.403 | |
| 5 | HDPE | 140 | 0.418 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 791 |