Project Completion Certificate (Ground Water)
Scheme ID: 20034294 Name of Scheme: LODIPUR No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3900 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 24-Nov-2022 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 30/189.68 Lodipur 26.383931 80.108661
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 52.60/61 Lodipur 26.383931 80.108661
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225/16 Lodipur 26.383931 80.108661
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.016 As per Site
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.300 As per Site
2 HDPE 75 0.09 As per Site
3 HDPE 90 0.574 As per Site
4 HDPE 110 0.188 As per Site
5 HDPE 125 0.120 As per Site
6 HDPE 140 1.029 As per Site
7 HDPE 160 1.811 As per Site
8 HDPE 180 0.343 As per Site
9 HDPE 200 0.174 As per Site
HSC Connection
Sno. Total Nos.
1 430
Other Details
2.62
2.59
2.59
29-Feb-2024
01-Mar-2024