Project Completion Certificate (Ground Water)
Scheme ID: 20034200 Name of Scheme: KAZAMPUR DEOLI WSS Gov No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3282 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-Aug-2024 Actual Date of Completion (Capex): 02-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.09M / 85.39M Kazampur Deoli 28.445461 77.812575
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 700 LPM / 51 M Kazampur Deoli 28.445461 77.812575
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200 Kl / 14M Kazampur Deoli 28.445740 77.812575
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 0.033
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.78
2 HDPE 75 0.28
3 HDPE 90 0.31
4 HDPE 110 0.21
5 HDPE 125 0.10
6 HDPE 160 0.15
7 HDPE 180 0.28
HSC Connection
Sno. Total Nos.
1 852
Other Details
2.17
2.14
2.19
30-Jan-2026
31-Jan-2026