Project Completion Certificate (Ground Water)
Scheme ID: 20033828 Name of Scheme: SAHNE MAU water Supply Scheme No. of Villages: 4 No. of Habitation Covered: 12
Total Population Covered: 5660 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Oct-2023 Actual Date of Completion (Capex): 07-Aug-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell assembly 33.01/86.36 Sahne Mau 26.4035671 82.661086
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 AC submersible pumping 17.5 HP 1200 sahne mau 26.403 82.661
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 325/18 sahne mau 26.4035 82.66108
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 31.5
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 2284.90
2 HDPE Pipe PN-6: Class PE-100 75 4894.20
3 HDPE Pipe PN-6: Class PE-100 63 15132.40
4 HDPE Pipe PN-6: Class PE-100 110 1335.30
5 HDPE Pipe PN-6: Class PE-100 140 825.60
6 HDPE Pipe PN-6: Class PE-100 160 586.40
7 HDPE Pipe PN-6: Class PE-100 200 1390.00
HSC Connection
Sno. Total Nos.
1 820
Other Details
4.41
4.19
4.19
07-Aug-2025
11-Aug-2025