Project Completion Certificate (Ground Water)
Scheme ID: 20033784 Name of Scheme: BHAISODI (MANYODA) PWS No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 2670 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2023 Actual Date of Completion (Capex): 21-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 21.04 Mtr./97.46 Mtr. Manyoda Bhesodi 26.646438* 79.679791*
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible (35.24 M3/Hr.)/45Mtr. Manyoda Bhesodi 26.646438* 79.679791*
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/15 Manyoda Bhesodi 26.678155* 79.70736*
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.16
2 HDPE 75 2.39
3 HDPE 90 .46
4 HDPE 110 .77
5 HDPE 160 .86
6 HDPE 180 .18
HSC Connection
Sno. Total Nos.
1 488
Other Details
1.71
2.15
2.15
01-Apr-2023
01-Jul-2023