Scheme ID: 20031408 Name of Scheme: Ant Village water supply scheme No. of Villages: 3 No. of Habitation Covered: 5
Total Population Covered: 4000 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 33.21/104.61 Ant 26.453705 80.107
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 81.5/65 Ant 26.453705 80.107
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/20 Ant 26.453705 80.107
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 .040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.796
2 HDPE 75 0.680
3 HDPE 90 2.391
4 HDPE 110 1.011
5 HDPE 125 0.464
6 HDPE 140 1.326
7 HDPE 180 2.660
HSC Connection
Sno. Total Nos.
1 776
Other Details
2.81
3.34
3.34
11-Apr-2024
12-Apr-2024