| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20031352 | Name of Scheme: AHIRAURA CHITTAURA PWS | No. of Villages: 1 | No. of Habitation Covered: 6 |
| Total Population Covered: 5557 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Mar-2028 | Actual Date of Completion (Capex): 05-Feb-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24/226 | AHIRAURA | 27.544351 | 81.67913 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump | 45/39 | AHIRAURA | 27.544351 | 81.67913 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200/16 | AHIRAURA | 27.544236 | 81.679103 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | RISING MAIN/DI-K7 | 150 | 0.0216 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6; Class PE-100 | 63 | 13.203 | |
| 2 | HDPE Pipe PN-6; Class PE-100 | 75 | 0.568 | |
| 3 | HDPE Pipe PN-6; Class PE-100 | 90 | 0.568 | |
| 4 | HDPE Pipe PN-6; Class PE-100 | 110 | 1.446 | |
| 5 | HDPE Pipe PN-6; Class PE-100 | 125 | 1.961 | |
| 6 | HDPE Pipe PN-6; Class PE-100 | 140 | 1.021 | |
| 7 | HDPE Pipe PN-6; Class PE-100 | 180 | 0.037 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 575 |