Project Completion Certificate (Ground Water)
Scheme ID: 20030802 Name of Scheme: CHITWAN WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 12
Total Population Covered: 3140 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 28-Sep-2023 Actual Date of Completion (Capex): 10-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200X150 24.16 M/224.84 M Chitwan 25.595835 82.325677
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 HP 635 LPM/43 M Chitwan 25.595835 82.325677
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/12 Chitwan 25.595809 82.325904
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 .01145 Yes
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.504 yes
2 HDPE 75 5.225 yes
3 HDPE 63 11.211 yes
4 HDPE 110 .418 yes
5 HDPE 125 .213 yes
6 HDPE 140 .157 yes
7 HDPE 160 .038 yes
HSC Connection
Sno. Total Nos.
1 445
Other Details
2.26
2.26
2.10
10-Oct-2024
11-Oct-2024