| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20030802 | Name of Scheme: CHITWAN WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 12 |
| Total Population Covered: 3140 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 28-Sep-2023 | Actual Date of Completion (Capex): 10-Oct-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200X150 | 24.16 M/224.84 M | Chitwan | 25.595835 | 82.325677 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.5 HP | 635 LPM/43 M | Chitwan | 25.595835 | 82.325677 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200/12 | Chitwan | 25.595809 | 82.325904 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 150 | .01145 | Yes |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 1.504 | yes |
| 2 | HDPE | 75 | 5.225 | yes |
| 3 | HDPE | 63 | 11.211 | yes |
| 4 | HDPE | 110 | .418 | yes |
| 5 | HDPE | 125 | .213 | yes |
| 6 | HDPE | 140 | .157 | yes |
| 7 | HDPE | 160 | .038 | yes |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 445 |