Project Completion Certificate (Ground Water)
Scheme ID: 20026417 Name of Scheme: Sirhaul PWS No. of Villages: 10 No. of Habitation Covered: 2
Total Population Covered: 3340 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2023 Actual Date of Completion (Capex): 21-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 24.03/131.60 Sirhual 26.860602 78.892651
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 45.01(M³/Hr.)/53Mtr. Sirhual 26.860602 78.892651
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/12 Sirhual 26.860602 78.892651
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 0.020
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.24
2 HDPE 75 1.12
3 HDPE 90 1.167
4 HDPE 110 1.107
5 HDPE 140 0.651
6 HDPE 160 0.678
7 HDPE 180 0.423
HSC Connection
Sno. Total Nos.
Other Details
1.97
1.97
2.23
07-Aug-2024
08-Aug-2024