| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20026417 | Name of Scheme: Sirhaul PWS | No. of Villages: 10 | No. of Habitation Covered: 2 |
| Total Population Covered: 3340 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-Sep-2023 | Actual Date of Completion (Capex): 21-Apr-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube Well | 24.03/131.60 | Sirhual | 26.860602 | 78.892651 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 45.01(M³/Hr.)/53Mtr. | Sirhual | 26.860602 | 78.892651 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200/12 | Sirhual | 26.860602 | 78.892651 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 100 | 0.020 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3.24 | |
| 2 | HDPE | 75 | 1.12 | |
| 3 | HDPE | 90 | 1.167 | |
| 4 | HDPE | 110 | 1.107 | |
| 5 | HDPE | 140 | 0.651 | |
| 6 | HDPE | 160 | 0.678 | |
| 7 | HDPE | 180 | 0.423 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |