| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20026344 | Name of Scheme: Turukpur Paharpur PWS | No. of Villages: 1 | No. of Habitation Covered: 5 |
| Total Population Covered: 2735 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-Sep-2023 | Actual Date of Completion (Capex): 07-Oct-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube Well | 27.08/108.80 | TURUKPUR PAHARPUR | 26.776593 | 78.833432 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 36.5(M³/Hr.)/46Mtr. | TURUKPUR PAHARPUR | 26.776593 | 78.833432 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 175/13 | TURUKPUR PAHARPUR | 26.776593 | 78.833432 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 150 | 0.0201 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.087 | |
| 2 | HDPE | 75 | 0.151 | |
| 3 | HDPE | 90 | 1.405 | |
| 4 | HDPE | 110 | 1.476 | |
| 5 | HDPE | 180 | 0.733 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 670 |