| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20026325 | Name of Scheme: Nagari Lolupur PWS | No. of Villages: 1 | No. of Habitation Covered: 6 |
| Total Population Covered: 2850 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-Sep-2023 | Actual Date of Completion (Capex): 29-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24.00 Mtr/124.33 Mtr | NAGRI LOLUPUR | 26.657725* | 79.230992* |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 36 M^3/ 45 Mtr | NAGRI LOLUPUR | 26.657725* | 79.230992* |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 175 KL/12 Mtr | NAGRI LOLUPUR | 26.657725* | 79.230992* |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.025 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.758 | |
| 2 | HDPE | 75 | 0.790 | |
| 3 | HDPE | 90 | 0.313 | |
| 4 | HDPE | 110 | 1.013 | |
| 5 | HDPE | 160 | 1.006 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 529 |