| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20026308 | Name of Scheme: Hatiya Ram Nath | No. of Villages: 2 | No. of Habitation Covered: 8 |
| Total Population Covered: 3023 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 02-Sep-2023 | Actual Date of Completion (Capex): 25-Feb-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 300 | 8m/60.25 | Hatiya ramnathpur | 25.847924 | 82.29023 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.5HP | 620LPM/44m | Hatiya ramnathpur | 25.847924 | 82.29023 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 175KL /12M | Hatiya ramnathpur | 25.847997 | 82.289947 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 100 | 0.04 | Yes |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 0.961 | |
| 2 | HDPE | 75 | 3.917 | |
| 3 | HDPE | 63 | 11.461 | |
| 4 | HDPE | 110 | 1.475 | |
| 5 | HDPE | 140 | 0.406 | |
| 6 | HDPE | 160 | 0.165 | |
| 7 | HDPE | 200 | 0.690 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 353 |