Project Completion Certificate (Ground Water)
Scheme ID: 20026159 Name of Scheme: ROSHANGARH WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 10
Total Population Covered: 4762 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 28-Sep-2023 Actual Date of Completion (Capex): 01-May-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering & Tubewell assembly 33.05/101.77 ROSHANGARH 26.413157 82.579178
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 AC Submmercible Pumping plant -17.5HP 950/48 ROSHANGARH 26.41 82.579
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC STRUCTURE 275/18 ROSHANGARH 26.413 82.57
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE-K7 150 0.027
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.999
2 HDPE Pipe PN-6: Class PE-100 75 4.054
3 HDPE Pipe PN-6: Class PE-100 63 13.019
4 HDPE Pipe PN-6: Class PE-100 110 3.350
5 HDPE Pipe PN-6: Class PE-100 140 0.444
6 HDPE Pipe PN-6: Class PE-100 160 1.565
7 HDPE Pipe PN-6: Class PE-100 200 1.739
HSC Connection
Sno. Total Nos.
1 512
Other Details
3.48
3.55
3.55
01-May-2026
02-May-2026