Project Completion Certificate (Ground Water)
Scheme ID: 20026073 Name of Scheme: BANGAON WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 7
Total Population Covered: 4120 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 28-Sep-2023 Actual Date of Completion (Capex): 08-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of tubewell assembly 43/100 Bangaon 26.4974392 82.4987939
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 AC Submmercible pumping 900/46 Bangaon 26.4974392 82.4987939
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC Structure 250/16 Bangaon 26.4974392 82.4987939
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K7 150 0.028
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 90mm dia HDPE pipe 90 2.615
2 75mm dia HDPE pipe 75 4.707
3 63mm dia HDPE pipe 63 20.693
4 110mm dia HDPE pipe 110 1.300
5 140mm dia HDPE pipe 140 0.737
6 160mm dia HDPE pipe 160 0.516
7 200mm dia HDPE pipe 200 0.506
HSC Connection
Sno. Total Nos.
1 655
Other Details
3.43
3.51
3.51
08-Mar-2026
09-Mar-2026