| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20026073 | Name of Scheme: BANGAON WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 7 |
| Total Population Covered: 4120 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 28-Sep-2023 | Actual Date of Completion (Capex): 08-Mar-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Lowering of tubewell assembly | 43/100 | Bangaon | 26.4974392 | 82.4987939 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | AC Submmercible pumping | 900/46 | Bangaon | 26.4974392 | 82.4987939 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC Structure | 250/16 | Bangaon | 26.4974392 | 82.4987939 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe K7 | 150 | 0.028 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | 90mm dia HDPE pipe | 90 | 2.615 | |
| 2 | 75mm dia HDPE pipe | 75 | 4.707 | |
| 3 | 63mm dia HDPE pipe | 63 | 20.693 | |
| 4 | 110mm dia HDPE pipe | 110 | 1.300 | |
| 5 | 140mm dia HDPE pipe | 140 | 0.737 | |
| 6 | 160mm dia HDPE pipe | 160 | 0.516 | |
| 7 | 200mm dia HDPE pipe | 200 | 0.506 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 655 |