| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20025579 | Name of Scheme: Rasulpur Mujaffar Gram Panchayat Water Supply | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3392 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 06-Jul-2023 | Actual Date of Completion (Capex): 23-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 21 / 152.75 | RASULPUR MUJAFFAR | 29.499577 | 78.502823 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 650 / 60 | RASULPUR MUJAFFAR | 29.499577 | 78.502823 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 200 KL / 16 MTR | RASULPUR MUJAFFAR | 29.499577 | 78.502823 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K7 | 150 | 0.020 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 6.9913 | |
| 2 | HDPE PIPE | 75 | 0.1041 | |
| 3 | HDPE PIPE | 90 | 0.3069 | |
| 4 | HDPE PIPE | 110 | 0.2066 | |
| 5 | HDPE PIPE | 125 | 0 | |
| 6 | HDPE PIPE | 140 | 0.3506 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 502 |