Project Completion Certificate (Ground Water)
Scheme ID: 20025498 Name of Scheme: Asewa No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2100 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 24-Aug-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 17.99/146.82 Asewa 26.173023 79.433875
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 38.7/62 Asewa 26.173023 79.433875
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 Asewa 26.173023 79.433875
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.014 As per Site
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.121 As per Site
2 HDPE 75 0.180 As per Site
3 HDPE 90 0.252 As per Site
4 HDPE 110 0.101 As per Site
5 HDPE 125 0.375 As per Site
6 HDPE 140 0.209 As per Site
HSC Connection
Sno. Total Nos.
Other Details
1.61
1.73
1.73
05-Aug-2023
06-Aug-2023