Scheme ID: 20025488 Name of Scheme: Bigahi No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2455 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 24-Aug-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 22/150.57 Bigahi 26.39799784 79.97416674
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 42.90/62 Bigahi 26.39799784 79.97416674
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 Bigahi 26.39799784 79.97416674
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.016 As per Site
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.252 As per Site
2 HDPE 75 1.30 As per Site
3 HDPE 90 1.090 As per Site
4 HDPE 110 0.484 As per Site
5 HDPE 140 0.806 As per Site
6 HDPE 160 0.170 As per Site
HSC Connection
Sno. Total Nos.
1 451
Other Details
1.71
1.89
1.89
02-Jun-2023
03-Jun-2023