| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20025383 | Name of Scheme: Akbarpur Devmal Gram Panchayat Water Supply | No. of Villages: 4 | No. of Habitation Covered: 4 |
| Total Population Covered: 2369 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 06-Jul-2023 | Actual Date of Completion (Capex): 15-May-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube Well | 24.10/124.49 | Akbarpur Devmal | 29.336452 | 78.305701 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 500/50 | Akbarpur Devmal | 29.336452 | 78.305701 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 kl / 14 mtr | Akbarpur Devmal | 29.336452 | 78.305701 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI - K7 | 100 | 0.025 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3.4837 | |
| 2 | HDPE | 75 | 0.1902 | |
| 3 | HDPE | 90 | 0.2169 | |
| 4 | HDPE | 110 | 0.399 | |
| 5 | HDPE | 140 | 2.6336 | |
| 6 | HDPE | 180 | 0.176 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 335 |