| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20025323 | Name of Scheme: SANGA PATTI VILLAGE WATER SUPPLY SCHEME | No. of Villages: 6 | No. of Habitation Covered: 8 |
| Total Population Covered: 2905 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 30-Sep-2025 | Actual Date of Completion (Capex): 13-Oct-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 9/63.10 | Sarai Bhawani | 25.862289 | 82.144541 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible pump | 30/57 | Sarai Bhawani | 25.862289 | 82.144541 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/16 | Sarai Bhawani | 25.862289 | 82.144541 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K9 | 80 | 0.0134 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 10.6838 | |
| 2 | HDPE | 75 | 0.070 | |
| 3 | HDPE | 110 | 0.770 | |
| 4 | HDPE | 140 | 0.248 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 370 |